Network Timetabling on the Railway
Code | Completion | Credits | Range | Language |
---|---|---|---|---|
617Y2SJ | KZ | 2 | 2+0 | Czech |
- Garant předmětu:
- Lecturer:
- Tutor:
- Supervisor:
- Department Děčín
- Synopsis:
-
Timetable samples. Capacity allocation, technological intervals in railway operation. Rules and regulations of train paths, running times, time adds and supplements. Rolling stock circulation planning. Rules of train-diagramm creating. Timetables for more service-levels on the line. Construction slot conflicts between passenger- and freight transport. Network line relations and waiting times, timetables for lines under construction.
- Requirements:
-
knowledge of transport technology, theory of transport and railway technology is necessary
- Syllabus of lectures:
- Syllabus of tutorials:
- Study Objective:
-
Creating of network-bounded railway timetables respecting all technological rules and own circulation schedules. Students will practise timetabling concerning various vehicles and capacity restrictions. During education will students win knowledge necessary for planning of operational-safe transport concepts, including network relations.
- Study materials:
-
Vonka, J., Molková, T., Široký, J.: Technologie a řízení dopravy II. ? GVD, skriptum DFJP Univerzity Pardubice, 2000.
Forschungsgesellschaft für Straßen- und Verkehrswesen: Merkblatt zum Integralen Taktfahrplan, Berlin, 2000.
- Note:
- Further information:
- No time-table has been prepared for this course
- The course is a part of the following study plans: